ServicesMigration and Upgrades

Move to Sugar or Epicor Kinetic, or upgrade the version you have, without losing your data

  • Epicor Platinum Partner
  • SugarAI Premier Partner
  • 100s of Epicor and Sugar implementations across the Americas

The vendors give you upgrade tools and documentation. They do not clean your data, rebuild the customizations that break, or redo the reports. TCP does. Every migration TCP runs ends with a reconciliation count you can check yourself.

Who this is for

  • On an old Sugar version and behind on updates.
  • On Salesforce, Microsoft Dynamics, HubSpot, Zoho, GoldMine, or a homegrown CRM, and moving to Sugar.
  • On Epicor 9 or 10, or on-premise Kinetic, and moving to current Kinetic in the cloud.
  • Running a first-generation chatbot or rule-based automation that should be an agent.

What the vendor gives you, and what TCP adds

The vendor gives youTCP adds
Upgrade tooling and release notesA review of every customization against the new version before anything runs
An import utilityData cleaning, field mapping, trial loads, and reconciliation counts
A new versionReports, workflows, and integrations rebuilt and tested
A cutover dateA rollback plan, and a cutover planned around your business calendar

Switching CRMs also means people lose the habits they built in the old one. TCP maps the features your team depends on and rebuilds them in Sugar. The switch should not cost anyone what they use every day.

Migration paths TCP has done

FromToWhat usually needs rebuildingEngagement
SalesforceSugarCustom objects, reports, email templates, automation rulesFixed price
Microsoft DynamicsSugarEntity mappings, workflows, Outlook habitsFixed price
HubSpotSugarSequences, lists, deal stages, marketing linksFixed price
Zoho, GoldMine, other legacy CRMsSugarNotes history, custom fields, saved searchesFixed price
Old Sugar versionCurrent SugarCode customizations, logic hooks, reports, integrationsFixed price
Sugar on-premiseSugar cloudCustomizations that touch the server, file storage, integrationsFixed price
Epicor 9 or 10KineticCustomizations, BAQs, dashboards, integrationsFixed price
Kinetic on-premiseKinetic cloudServer-dependent customizations, integrations, print routingFixed price

How TCP protects the data

Six steps, with two checkpoints you control: you sign off before anything moves, and you confirm before the old system goes read-only.

  1. 1 · You sign off

    Map

    Every field from the old system to the new one, written down. You sign off before anything moves.

  2. Step 2

    Trial load

    A full copy into a test system. Your team clicks around in it.

  3. Step 3

    Reconcile

    Record counts by object. Spot checks on the accounts that matter most. Fix, reload, repeat.

  4. Step 4

    Rebuild

    Reports, workflows, and integrations that break get rebuilt and tested in the test system.

  5. Step 5

    Cutover

    Final load on an agreed date. Rollback plan ready in case.

  6. 6 · You confirm

    Verify

    Counts match. You confirm. Then the old system goes read-only.

What the work looks like, platform by platform

For Sugar

A version upgrade with years of customizations

  • Code review against the new version. What still works, what will not.
  • Testing in a copy of your instance.
  • Rebuilding what breaks: logic hooks, custom modules, integrations.
  • Retraining on screens that changed.
  • Combining the upgrade with a new integration when it makes sense. One project, not two.

Moving from another CRM follows the same six steps, plus feature mapping so nobody loses what they rely on.

For Epicor Kinetic

What an Epicor upgrade involves

  • Customizations and BAQs reviewed and converted for Kinetic.
  • Integrations retested.
  • On-premise to cloud: server-dependent customizations reworked, print routing and file storage moved.
  • Cutover planned around production. A 24/7 plant cannot stop for a weekend.

For AI agents

Two points

  • Agents survive upgrades. Fluent agents connect through the connector layer, not through customizations inside Sugar or Kinetic. An upgrade needs a test, not a rebuild.
  • Older automation gets replaced. A first-generation chatbot or a pile of rule-based automations: TCP moves the same knowledge into an agent that does more.

Proof

Frequently asked questions

Every field is mapped and you sign off on the map. A trial load goes into a test system first. Record counts are reconciled before cutover. Notes, emails, and attachments move with their records.

Usually code customizations, logic hooks, and integrations built against old APIs. TCP reviews all of it before the upgrade runs and rebuilds what will not carry over.

It depends on record volume, custom objects, and how much automation needs rebuilding. TCP gives a fixed price and a duration range after a free assessment.

Yes. It is usually the better path. One test cycle, one cutover.

Customizations and BAQs converted, integrations retested, users retrained on the Kinetic screens, and a cutover planned around production.

No. They connect through the connector layer. They need a test, not a rebuild.

Record counts by object before and after, spot checks on your most important accounts, and your own confirmation before the old system is turned off.

Request a free migration assessment

Tell TCP what you run today, the version, and roughly how many records. You get a written plan: what moves, what gets rebuilt, and a fixed price.

Request the assessment

Related services

Work with TCP

Find out how TCP can help you leverage technology to streamline operations and maximize growth.