ServicesEpicor Kinetic Implementation

Epicor Kinetic implementation with CRM and AI built in

  • Epicor Platinum Partner
  • SugarAI Premier Partner
  • 100s of Epicor and Sugar implementations across the Americas

Most Epicor partners know the ERP. TCP knows the ERP, the CRM your sales team will use, and the AI agents that will read Kinetic data. One partner, one plan, in English and Spanish, across North and Latin America.

Who this is for

  • Mid-size manufacturers moving to Kinetic from a legacy ERP.
  • Companies upgrading from Epicor 9 or 10.
  • Companies with plants in the US, Mexico, and elsewhere in the Americas that want one partner across all of them.
  • Engineer-to-order, configure-to-order, and complex scheduling environments.

What the vendor gives you, and what TCP adds

Epicor gives youTCP adds
The license, a methodology, and a large partner networkA partner that has run Kinetic implementations for over a decade in both languages
An ERPThe CRM plan and the connection between them, scoped from day one
Native Epicor AI featuresAI agents that read Kinetic data and act on it: approvals, communications, shop-floor reporting
Support for the productSupport for your business, including the vendor case when it comes to that

How TCP runs a Kinetic implementation

The same shape as the Sugar implementation, so the two feel like one family. The CRM and AI branch runs alongside. Fixed price for defined scope, with the duration range stated in the estimate.

  1. Step 1

    Discovery

    TCP walks the plant and the office. Quote-to-cash, order-to-ship, purchasing, inventory, scheduling.

  2. Step 2

    Configure

    Modules, business rules, BAQs, dashboards, Kinetic layouts. Epicor's methodology where it fits, TCP's experience where it does not.

  3. Step 3

    Migrate data

    Items, BOMs, routings, customers, suppliers, open orders, open AP and AR. Trial loads and reconciliation counts before cutover.

  4. Step 4

    Train

    By role and by shift. Shop floor, planning, purchasing, finance, sales.

  5. Step 5

    Go live

    Cutover planned around the production calendar. Then stabilization under support hours.

Parallel track: the CRM and AI plan is designed alongside, so the customer master, pricing, and quote flow get designed once.

What gets built, platform by platform

For Epicor Kinetic

Manufacturing patterns TCP has built before

  • Engineer-to-order: quote-to-job flows where every order is a project.
  • Configure-to-order: product configurator rules and pricing.
  • Complex scheduling: finite capacity, multi-resource, 24/7 plants.
  • Traceability: lot and serial tracking for food, medical, and regulated industries.
  • Multi-site and multi-currency: plants in different countries on one instance.
  • Epicor Grow and FP&A: reporting and planning on top of the ERP.
  • Advanced MES: shop-floor data capture.

For Sugar

An ERP implementation is the right time to plan the CRM

  • Orders, shipments, and invoices on the account.
  • Quotes that become sales orders without re-keying.
  • Credit status before the quote goes out.

Already have a CRM? TCP connects Kinetic to it.

For AI agents

Agents that attach to Kinetic at go-live or soon after

  • Natural-language questions: ask the ERP in plain words, no BAQ.
  • Automatic communications: invoices, credit memos, receipts sent as they post.
  • Approvals by phone: requisitions routed and approved from anywhere.
  • Shop-floor reporting by WhatsApp: incidents with photo or video, no terminal.
  • AP invoice reading: matched to POs and routed.

What the Kinetic plus Fluent picture looks like

Kinetic as the source of truth, Fluent as the hub, five outputs. This is the picture from the Greenpaper case study.

Epicor Kinetic

Source of truth

Fluent

The hub

WhatsApp maintenance reporting

Automatic document delivery

Mobile approvals

Plain-language answers

AP invoice reading

Training

  • Role-based, delivered on site or remote, in English or Spanish.
  • Shop-floor training on the shop floor, on the shift that will use it.
  • Administrator training so your team owns BAQs, dashboards, and user setup.

Project management

  • One TCP project lead. One customer project owner.
  • Weekly status. Shared task list. Cutover plan agreed with production.
  • Scope changes written, priced, and approved before work starts.

Proof

Frequently asked questions

It depends on sites, modules, data, and how much process change comes with it. TCP states a range in the fixed-price estimate. Plan in months.

Cost is driven by users, sites, modules, data migration, and integrations. TCP quotes a fixed price for defined scope after discovery.

Plan it at the same time. Build it when the team is ready. The customer master and pricing get designed once if the plan exists from the start.

Yes. TCP works in English and Spanish across North and Latin America. Greenpaper, Tecnas, IPSL, and IMPELMEX are all in Mexico.

Cloud is hosted by Epicor, updated on Epicor's schedule, and needs no servers. On-premise runs on your hardware and you control the update timing. Most new implementations go cloud, and TCP has moved on-premise customers to cloud.

Yes. TCP starts with a health check of what was built, then proposes a fixed-price plan to finish or fix it.

TCP has configured both. ETO uses quote-to-job flows where each order is a project. CTO uses the configurator with rules and pricing built to your product structure.

Talk to a Kinetic implementation lead

Thirty minutes. Bring your biggest operational pain point. TCP will tell you how Kinetic handles it and what an implementation would involve.

Book the call

Related services

Work with TCP

Find out how TCP can help you leverage technology to streamline operations and maximize growth.